The Future of Camp Ta-Kum-Ta
Finish our cabin village
Camp has two remaining cabins to be funded (one still to be built) to complete our cabin village which will have 9 cabins, when complete.
Water, Waste Water and Electrical upgrades
Waste water hook ups are ahead of us with the cabins, all needing bathroom facilities, sewer system, hook ups, septic tanks, pumping stations, purification tanks, mound systems and the piping to connect it all.
Landscaping (paths, low voltage exterior lighting)
Planting of trees and shrubs (2 trees and 5 shrubs at each cabin and 9 shrubs and a tree outside the activities building) will complete our landscaping needs at our facility. We will also need appropriate low voltage lighting from cabins to lodge and along the driveway from the gate to the security building.
Swimming pool
We plan to replace our pond with an in ground swimming pool.
Splash pad
This will require a complete plan developed with at least six elements provided. The splash pad will need a water source of its own.
Chapel
Camp Ta-Kum-Ta is planning the construction & design for our future chapel. The chapel will be used for our annual memorial service and our closing ceremonies at the end of our programs.
Memorial Garden & Brick Walkways
The memorial gardens (Generously sponsored by the Wyand family in loving memory of Jeff Wyand) will be laid out by a professional designer. We would incorporate trees, shrubs and perennials Also, annual flowers will be added to provide color.
Athletic fields & courts
We hope to put a ball field (ACT 250 permit needed), tennis courts, and basketball courts at our facility.
Alarm system
The following buildings will need an alarm
system:
1 cabin, security building, and the chapel area.